Process automation · Grid Flow℠

    Your team repeats.The system should repeat.

    Process automation is taking off people’s hands what the computer does better: moving a piece of data, chasing a reply, generating a report, sending a message at the right time. You still decide.

    Tell us your case

    The problem

    Do any of these sound familiar?

    If one of them describes your week, the rest of this page is about that.

    • The same order gets typed three times

      It comes in on the site, gets copied to the spreadsheet, then re-entered into the system. Every copy is a chance to get it wrong.

    • The follow-up depends on someone remembering

      The proposal goes cold because chasing the reply lives in one person’s head, not in the process.

    • Closing the month takes a whole day

      The report exists, but someone has to build it by hand every time, from three different sources.

    • When someone is out, the process stops

      The knowledge lives in one person’s routine. Time off becomes an operational risk.

    • No one can say where it got stuck

      The order vanished between two tools and the only way to find it is to search each one.

    The work

    What automation does, in plain terms.

    An automated flow is a sequence of steps that runs on its own when something happens: an order arrives, a deadline passes, a form comes in. Each step does one thing and logs what it did.

    The difference between this and a duct-tape fix is what happens when it fails. A well-built flow retries, keeps a record of what went wrong and alerts a person. A badly built one fails in silence, and you find out from the customer.

    What you get

    • A map of the process as it is today, before touching anything
    • A flow built in parts, each one already in production
    • Failure alerts on a channel the team actually reads
    • A record of what ran, to audit later
    • Documentation of who does what, so it never becomes a black box

    How it happens

    Four steps, in this order.

    The first direction arrives within 24h
    1. 01

      A map of what exists

      We sit down with whoever runs it today and write the real process, not the one in the manual.

    2. 02

      Scope, timeline and price

      You approve a closed path before we start. No endless discovery.

    3. 03

      First stretch live

      We start with the part that hurts most, and it goes into production ahead of the rest.

    4. 04

      Monitoring and tuning

      The flow stays under watch. When the operation changes, the flow keeps up.

    In practice

    Where it usually fits

    No closed list. If your case isn’t here, it probably looks like one of these.

    Client registrationBilling and financeSchedulingSales follow-upRecurring reportsWhatsApp supportClient onboardingInternal approvalsInvoicingInventory control

    What we work with

    Orchestration

    n8nMakeZapier

    Intelligence

    OpenAIClaudeWhisper

    Channels and data

    WhatsApp APIGoogle WorkspaceSupabasePostgreSQL

    Before you decide

    What people usually ask.

    No. Automation sits on top of what already exists and talks to your current tools. Replacing a system is a business decision, not a technical prerequisite.

    If at some point the current tool becomes the bottleneck, we say so clearly, along with the cost of staying on it.

    Every flow is born with failure alerts. When a step doesn’t complete, the error is logged and someone is notified on the channel the team already uses.

    What can’t happen is failing in silence. That’s the line between automation and a duct-tape fix.

    Yes, and it’s the part we consider the real work. Processes change, tools update, new rules appear.

    You can take the maintenance in-house too. In that case the documentation and access are yours from day one.

    Yes. Day-to-day operation doesn’t require anyone who codes: the flows run on their own and the dashboard shows what happened.

    What requires technical people is building and maintaining. That part is ours.

    It depends on the process, and we only commit after looking. What’s fixed is the format: delivery comes in parts, and the first part goes to production instead of waiting for the whole project.

    Within 24h of first contact you get a direction. The proposal comes with scope, timeline and price locked in.

    The next step

    Tell us what got stuck. You leave with a direction.

    Describe the situation in two lines. Within 24h we send back a direction and, if it makes sense, a proposal with scope and price.

    Send via form